<progress id="ji4bk"></progress>
<rp id="ji4bk"></rp>
  • <th id="ji4bk"></th>
      <em id="ji4bk"><acronym id="ji4bk"></acronym></em><th id="ji4bk"></th>

        Coronado High School Cafeteria Renovation

        Coronado High School

        Coronado High School, Lubbock, TX

        Coronado High School
        Lubbock, TX

        Construction Cost: The cafeteria is roughly 10% of a projected $11 million campus renovation.

        Completion Date:?Total renovation completion is scheduled for the Fall of 2013.

        Purpose:?Complete renovation/addition as part of the LISD bond election and the initiative to close the campuses of all high schools and make the cafeterias more appealing to the students.

        Contractor/Client: Lee Lewis Construction

        Description: As part of the renovation of the school cafeteria, Sterling Building Materials provided materials from several different manufacturers, including:

        • toilet partitions by Scranton Products in the new restrooms
        • FE and cabinets by Larsen’s throughout the complex
        • Dedication plaque by Southwell
        • Aluminum floor hatch by Bilco

         

        网上现金棋牌app